Einzelnen Beitrag anzeigen
Alt 21.08.2002, 15:51   #14
CarstenB
Inventar
 
Registriert seit: 02.01.2002
Beiträge: 2.979


Standard

Hier mal ein Auszug aus dem Text, der vor der Installation des PSS / Ghosh Airac 0208 angezeigt wird:

KNOWN ISSUES:
=============

...
(3) RNAV SID/STAR information is NOT INCLUDED in this database. I am investigating the possibility of including these in a future cycle. Therefore, some airports (particularly in Europe) will not have these information for now.

(4) Some airports contain only Vector departures/arrivals. These are ATC given vectors to an airway transition points and are therefore, not included in FMC databases. Likewise, some airports do not have published SID/STARs and these are not present in this database.

(5) Approach information is NOT INCLUDED in this database. Approach segments come after the STAR portion of the route and lead the airplane onto the runway threshold. Unfortunately, approach information is often mistaken as part of the STAR even though this is not the case. Approach information is distinct from the STAR information. I am researching the possibility of regularly including approach information into the database. This, hopefully, will cut down a lot of the misconceptions/bug reports, etc."

Vielleicht hilft es ja.
____________________________________
Tschüß

Carsten
_____________________________________
[url=www.charliebravo.de]Charliebravo.de - Flugzeugbilder und mehr[/url
CarstenB ist offline   Mit Zitat antworten